Site Planning and Development
Laboratory Exercise
ACSM 520
October 10, 2002
DUE: Tuesday,
October 17, 2002
1.
Plot
plan identifying boundaries and utilities
From this
information, draw a site plan showing all identified boundaries, utilities, and
surface features.
ุ
Property
boundaries starting at the northwest corner and going at 90 8 for 240, then at 180 8 for 360, then at 2708 for 200 and close on the northwest starting point.
ุ
The
north property line is the centerline of a 16 wide street that has a 50
right-of-way on each side of the centerline of the street.
ุ
A
sanitary sewer line enters the north property line 15 to the east of the west
end and exits at the west end of the south property line. The line runs
straight through the property. The sanitary sewer easement is 25 wide.
ุ
An
electric line runs parallel to the east boundary line. It is 10 onto the
neighbors property. The electric company has a 25 easement.
ุ
Zoning
requires a 10 setback from the edge of the road to any drive or parking lot and
30 setback from the edge of the road to any building.
ุ
Zoning
requires a 10 setback from all other property lines.
ุ
A
bike path crosses the southwest section of the land. It enters the property 25
(along the property line) north of the southwest corner and exits the property
30 east of the southwest corner.
2 Building and parking lot
On the
site from above, show a proposed location of a 42 wide by 96 long office
building.
ุ
Because
of the type of construction (based on materials used), the building must be at
least 30 from all property lines. The plan is for future buildings on the site
to form a U arrangement. The buildings front onto the U
ุ
Road
entrance from the street along the north property line is to be and located at
the northeast corner of the property.
ุ
Provide
diagonal parking in front of the buildings along both sides of a drive.
ุ
Walks
are to connect to a sidewalk along the street and extend to all buildings.
Mfb/20021010